External Staircase Replacement in Harrow

Client: ACAI Group Modelled by: Sam Thewsey of DSD Ltd Job date: 2020 We were commissioned by ACAI Group to replace a badly corroded external staircase at the rear of a property in Harrow. The existing stair, being probably in excess of 20 years old, did not conform to current regulations and nor could the replacement stair due toContinue reading “External Staircase Replacement in Harrow”

Feature Staircase for Xero, Kings Cross, London

We were commissioned by Denton Associates to design a feature staircase for an office fit out for Xero in Kings Cross. Client: Denton Associates Structural detail by: Mark Ebbs The challenge here was that the stair ran from 7th to 8th floor levels, and the only access was via a 2.5m long lift, so all the stairContinue reading “Feature Staircase for Xero, Kings Cross, London”

Secondary Steelwork for Comast Construction Ltd, City Island, East London

Client: Comcast Construction Job date: May 2018 – August 2020 We carried out various secondary steelwork structures to a site in East London for Comast Construction, who were under contract to Ballymore Group. The works partly consisted of steel roof and staircase structures connected to a reinforced concrete building. The biggest challenge was our extremely difficult access problems! WeContinue reading “Secondary Steelwork for Comast Construction Ltd, City Island, East London”

Steel Feature Staircase at Berners St, Westminster, London

Client: Oktra Modelled by: Mark Ebbs Job date: May 2020 The  LSJ Engineering team was appointed by Oktra, an office fit out company, to design, supply and fit a feature staircase to their Berners St project in Westminster, London. The stair is unusual in that the stair stringers extend to full height to form theContinue reading “Steel Feature Staircase at Berners St, Westminster, London”

External Basement Access Staircase at Old Burlington St, Mayfair, London

Client: ACAI Group Modelled by: Mark Ebbs Job date: June 2020 LSJ Engineering was commissioned by ACAI Group to replace a badly corroded external basement access staircase at their property in Old Burlington St, Mayfair, London. The existing stair, being probably in excess of 30 years old, did not conform to current regulations and norContinue reading “External Basement Access Staircase at Old Burlington St, Mayfair, London”

Internal Fire Escape Stairs for WeWork East Road

Client: LTB Modelled by: Mark Ebbs Date: June-July 2018 We were asked to design, supply and fit a nine story internal fire escape stair in a new building for LTB, who have the contract to refit offices for WeWork. The stair ran up through voids in the concrete floors which were already formed during theContinue reading “Internal Fire Escape Stairs for WeWork East Road”

Notting Hill Gate Acoustic Enclosures & Bin Store

Client: Collins Construction Structural detail by: the LSJ team Job Duration: 2019-2020 We designed and supplied three acoustic roof plant enclosures by Collins Construction at their Notting Hill Gate project. The main works were a refurbishment and remodelling of an office and retail space next to Notting Hill Gate station. The building had two floors added,Continue reading “Notting Hill Gate Acoustic Enclosures & Bin Store”

Access Staircases at Linden Court, Leigh-on-Sea, Essex

Client: Dedman Property Management Modelled by: Mark Ebbs Job Date: late 2016 We were commissioned to design and supply two replacement access staircases to the rear of a private block in Leigh-on-Sea by the building management company. They had to be functional, comply to current building regulations and have a minimum life of 30 years,Continue reading “Access Staircases at Linden Court, Leigh-on-Sea, Essex”

Staircase for WeWork Finsbury Pavement, London

LSJ was commissioned by LTB Ltd to construct a staircase for the WeWork building in Finsbury Pavement, London. Client: LTB Structural detailing by: Sam Thewsey of Draft SD Job Date: early 2018 One of several staircases we have supplied for LTB, who have the contract to refit offices forWeWork. A common design feature for this client is the slimContinue reading “Staircase for WeWork Finsbury Pavement, London”

Horatio’s Garden, Stoke Mandeville Hospital

LSJ was commissioned a new build for Horatio’s Garden at Stoke Mandeville Hospital in 2018. Client: Boom Construction Structural detail by: Mark Ebbs Job Duration: February 2018-September 2018 We were asked to design, supply and fit an unusual structure by Boom Construction for a charity funded garden at Stoke Mandeville Hospital. The structure was formedContinue reading “Horatio’s Garden, Stoke Mandeville Hospital”