Notting Hill Gate Acoustic Enclosures & Bin Store

Client:┬áCollins Construction Structural detail by: the LSJ team Job Duration: 2019-2020 We designed and supplied three acoustic roof plant enclosures by Collins Construction at their Notting Hill Gate project. The main works were a refurbishment and remodelling of an office and retail space next to Notting Hill Gate station. The building had two floors added,Continue reading “Notting Hill Gate Acoustic Enclosures & Bin Store”

Office Building for Legalease, Fleet St, London

We were commissioned by Leaglease to add lift shafts, stairs and an extra floor to their building in Fleet St, London. Client: Legalease Structural detail by: Mark Ebbs & Mick Simpson Job Duration: 2016-2017 (18 months) Space to develop in London is rare, so it is becoming increasingly common to extend upwards rather than sideways,Continue reading “Office Building for Legalease, Fleet St, London”

New Build for Capel Manor School, Enfield, London

LSJ Engineering was commissioned by T&B Contractors to to construct a new build for Capel Manor School in Enfield. Client: T&B Contractors Structural detail by: Mark Ebbs Job Duration: 2016 This was a new build structure of around 40 tonnes, fairly lightweight for a building of this size and only single story, but complicated byContinue reading “New Build for Capel Manor School, Enfield, London”